17 James Street Wallsend NSW 2287 Australia
Tel: +61 2 4903 7000 Fax: +61 2 4951 1070
Recondition of 80km of track, with replacement of existing pipe culverts with cattle drige culverts.
View Project Detail
Track inspection works and track maintenance works
Re-rail 700m of stacker track with 51 No. 13.72m lengths of new 53kg rails
To date Daracon have been involved with the Stage 1 and the Stage 2 Early Works components of this agreement and are now constructing the New Rail Line Works.
The Mangoola project is a proposed 10.5 million tonne per annum Run Of Mine, Open Cut Mine, processing plant and rail load out facility complete with the necessary roads and infrastructure.
The replacement of the single track existing transom top steel bridge on the Up main at Melbourne Street, East Maitland. This involved removing two steel plate girder bridges and reinstalling one steel plate girder bridge in a 72 hour possession closedown.
Replacement of existing steel and timber structure with reinforced concrete box culverts.
Daracon Rail constructed 5.2 km of new rail infrastructure for coal stackers and coal reclaimers within the PWCS expansion Project on Kooragang Island.
A 151m track reconditioning at Singleton of the Up main.
New Bridge and Railway Track Re-alignment at Loxford
Completion of various track maintenance works and minor works for ARTC.
Completion of various track maintenance works and minor works for various clients.