Putty Road Bridge
Putty Road Bridge
View image gallery
Client Information
Coal & Allied
Duration:
5 months
Value:
$2.4 million
Location:
Putty Road
Project Details
Scope of Work
Reinforced earth walls
Excavation and Pour Cast In-situ Piles
Installation of Pre-Cast T-Beam Girders
Full bridge construction
Installation of 4 metre high safety screens
Approach Barriers by slip forming
Road pavements
Stormwater Drainage and structures
Landscaping
Significant Achievements
The work involved reinforced earth walls at the bridge abutments. These walls were 5 metres high by approximately 80 metres in length each with extensive strapping and select fill extending 8 metres behind the wall.
Maintaining traffic continuity was an essential aspect of the work.
Full compliance with Coal and Allied’s Health, Safety and Environmental systems.
Excavation of piles and construction of piles cast in-situ to ground level. Extension of piles a further 5 metres above ground using scaffold falsework and formatube.
Community liaison extremely sensitive due to the bridge being connected with the mine sites of Warkworth and Mount Thorley.
Construction of the bridge substructure including abutment construction, installation of 20 T-beams each weighing 38 tonnes, deck construction involving reinforcement up to 38 mm in diameter, approach slab construction, slip forming of 140 metres of approach barriers 2.2 metres in height and final installation of seals, cover plates and safety screens.
Construction of stormwater drainage, pavements, sealing guardrail to complete works.