Mine Infrastructure Installation and Maintenance
2005, ongoing through into 2011
Client Information
Coal & Allied
- Duration: 6 years and ongoing
- Value: Total $10 million
- Location: Various Rio Tinto Coal Mines across the Hunter Valley
-
Project Details
Scope of Work
Work for this project involved building and maintaining various mine facilities including haul roads, access tracks, water re-fill structures and environmental controls
Significant Achievements
- Road maintenance and drainage works
- Construction and maintenance of haul roads and access roads throughout the mine sites
- Installation of drainage structures
- Restoration and repair of drains and other structures
- Concrete structures including culverts, headwalls and aprons
- Installation of gabion baskets
- Construction of mine support facilities e.g. water points, pipe lines and environmental controls