Environmental Control Dam

Client Information

John Holland (for BHP Billiton)

  • Duration: 9 months
  • Value: $5 million
  • Location: Mount Arthur Coal Mine, Muswellbrook
  • Project Details

Scope of Work

  • The main dam is 650m long and 15m high covering 6.5 ha.
  • The wall is a zoned envelope containing 300,000 m3 of material.

Significant Achievements

  • The natural material was variable in quality and was often found to contain excessive moisture making it very difficult to manage.
  • The work adjoined a major public road and although this provided constant public scrutiny of the site there were no complaints or adverse comments made about Daracon’s performance.
  • The concrete spillway and terraced gabion walls is an attractive feature of the design and can be easily seen from Denman Road.
  • The site was protected from flooding before dam construction commenced by installing a series of diversion banks and drains.  This also helped to keep the poorer material as dry as possible.