Boggabri Coal Terminal Upgrade
January 2011 - April 2011
Client Information
Boggabri Coal Pty Ltd
- Duration: 12 weeks
- Value: $2.8 million
- Location: Boggabri, North West NSW
-
Project Details
Scope of Work
Our scope of works included the undertaking of bulk earthworks, roadworks, detailed concrete pavement works and stormwater drainage for the new Loop Road associated with the Boggabri Coal Terminal.
Significant Achievements
- Delivery within the required program.
- Detailed excavation of approximately 25,000m² of material using GPS machine control.
- Supply and installation of approximately 6,000T of stabilised road base in a 750mm layer.
- Construction of 250mm thick reinforced concrete pavement slabs, totalling 90m³.
- Installation of approximately 350T of 40mm thick polymer modified asphalt.