Client Information

Barclay Mowlem Constructions Limited

  • Duration: 4 Months
  • Value: $2.1 Million
  • Location: Bayswater Coal Mine, Hunter Valley
  • Project Details

Scope of Work

A new rail loop was constructed to allow safe and smooth loading operations within the coal mine. Daracon supplied heavy earthmoving equipment that was prepared to coal mining standards.
Machines included:

  • D9 Dozer
  • 631 Scrapers
  • Excavator (35 Tonne to 20 Tonne)
  • Compactors
  • Graders

Significant Achievements

  • Barclay Mowlem required all plant items to have proven reliability and presentation
  • Operators were given a 6 hour site induction to completely familiarise them with site conditions and procedures
  • Environmental issues were rigorously enforced on site
  • Special attention was given to the presentation of machines to ensure there were no oil leaks or excessive noise emissions.
  • Daracon’s operators carried out daily inspections of their machines to make sure that they maintained the required standard and continued to perform reliably