17 James Street Wallsend NSW 2287 Australia
Tel: +61 2 4903 7000 Fax: +61 2 4951 1070
Construction of 900m long sheet pile wall
View Project Detail
Weir Crest Upgrade
Earthworks, roadworks, concrete, stormwater drainage
Concrete Works
Rehabilitation of 27 natural gas well sites
Coal Export Terminal
Supply and install 3.5km of 600mm diameter DICL water main
The Mangoola project is a proposed 10.5 million tonne per annum Run Of Mine, Open Cut Mine, processing plant and rail load out facility complete with the necessary roads and infrastructure.
Construction of Ropes Crossing Boulevard, a 1.2km two way divided road.
Wick Drain Installation
Major Civil Contract for Earthworks, Concrete and Rail
3EXP and MPC
Daracon was involved in the bulk earthworks, detailed excavation for STP structures and effluent ponds, construction of internal roads
The project involved the realignment of a poor section of the existing New England Highway. The project was 1.9Km long and was located approx. 17 km to the north of Armidale. The existing highway was in a rural environment with sharp curves and crests as well as a sub-standard intersection with the Sunnyside Road.
Project featured two new bridges - one across the Hunter River, and one across the Main Northern Rail lines.
Replacement of the Tourle St Bridge onto Kooragang Island